Skip to main content

Based in the heart of Warrington, our £10 million iconic building stands out on the skyline. Rising six stories high, each floor is filled with state-of-the-art equipment, reflecting a £1m investment in creating an innovative and exciting environment for students to learn.

As part of our new T Levels for 2023, we have received funding to renovate our building and buy new specialist equipment, specifically tailored for our T Level courses. UTCW facilities also include:

  • Computer Aided Design (CAD) suites
  • Computer Numerically Controlled (CNC) machine suite
  • Electronics workshop
  • Five high-spec science laboratories
  • £540,000 investment in state-of-the-art ICT resources throughout
  • Fujitsu digital hub
  • High-spec prototyping facilities with laser cutting and 3D printers
  • Hydraulics & pneumatics workshop
  • Industry-standard specialist engineering equipment
  • Latest interactive systems and programming software
  • Materials’ testing workshop
  • Mechanical & manufacturing engineering workshop
  • New Cyber hub
  • VEX Robotics equipment

All this plus:

  • Dedicated Sixth Form area on the fourth floor
  • American diner themed restaurant
  • Power Station coffee shop and grab-and-go deli

Workshop, Ground Floor

Learning Resource Centre, 4th Floor

Power Station Cafe, 3rd Floor

Hydraulics & Pneumatics, 2nd Floor