Based in the heart of Warrington, our £10 million iconic building stands out on the skyline. Rising six stories high, each floor is filled with state-of-the-art equipment, reflecting a £1m investment in creating an innovative and exciting environment for students to learn.
As part of our new T Levels for 2023, we have received funding to renovate our building and buy new specialist equipment, specifically tailored for our T Level courses. UTCW facilities also include:
- Computer Aided Design (CAD) suites
- Computer Numerically Controlled (CNC) machine suite
- Electronics workshop
- Five high-spec science laboratories
- £540,000 investment in state-of-the-art ICT resources throughout
- Fujitsu digital hub
- High-spec prototyping facilities with laser cutting and 3D printers
- Hydraulics & pneumatics workshop
- Industry-standard specialist engineering equipment
- Latest interactive systems and programming software
- Materials’ testing workshop
- Mechanical & manufacturing engineering workshop
- New Cyber hub
- VEX Robotics equipment
All this plus:
- Dedicated Sixth Form area on the fourth floor
- American diner themed restaurant
- Power Station coffee shop and grab-and-go deli