The erection of the stair and lift cores and the installation of the connecting precast concrete stairway has continued this week. The first of the two stair cores and lift shafts are up to the fifth floor and the capping slabs which will complete this section of work are on site and  ready to be lifted into position on Monday following the delivery and set up of a larger crane 200Ton.